Unattended, high-frequency automated inspection of passive and active microwave modules, with resources configured per DUT and testing scheduled by time sequence or environmental condition.

This general-purpose microwave module environmental test solution was developed for the environmental testing of passive and active microwave modules and components. Users configure test resources according to the device under test, and the solution is closely integrated with the environmental test process. It supports unattended, high-frequency automated inspection of multiple modules or components in batches, scheduled by time sequence or by environmental condition, with real-time monitoring and protection of product operating status and powerful mass-data processing and reporting. It meets the batch test requirements of microwave modules and components from different fields during development, production and environmental testing.
Custom user-specific test equipment · Flexible test resource management · Flexible combination of test tasks · Complete calibration strategy for measurement accuracy · Unattended fully automatic testing · Comprehensive safety protection and alarm mechanisms · Powerful data processing · Access control
Users can customise switching networks, status control and status monitoring equipment to suit their own test requirements.
Users manage the enable state, model, type, programming address, test driver and virtual soft panel of each instrument by building function modules. The software ships with a rich instrument driver library and strong interchange support for common types of test instrument at home and abroad.
Test sequences are built on a three-level mechanism of sequence, plan and step, with the test parameter as the smallest unit, giving test tasks a high degree of flexibility.
The test loop is split into uplink and downlink paths and calibrated separately, with different compensation strategies applied to ensure measurement accuracy.
Automatic testing can be scheduled by time sequence or by environmental condition. During a run the system performs each test action automatically: acquiring environmental parameters such as temperature and vacuum, controlling the power-up and power-down sequence of the DUT, applying DUT control signals, monitoring DUT operating status and controlling the relevant instrument parameters, with live viewing of results and curves during the run. (1) Scheduling by time sequence requires the test start time, the interval between tests and the number of cycles. (2) Scheduling by environmental condition provides a graphical editor so that test staff can build complex environmental condition sequences visually and quickly. An environment curve is made of lines and points: the lines are the transitions between conditions, the points are the target states and test actions, and the current progress is tracked dynamically during execution.
The designers built countermeasures for the various hazards that can arise during testing. (1) Reliability: a resume-after-interruption function avoids the risks of power failure or accidental shutdown; a thread-lock technique handles multiple test tasks requesting the same test resource; a perpetual-calendar algorithm with time-based judgement keeps scheduling accurate over very long test runs. (2) Comprehensive safety alarming: voice, audible/visual and on-screen alerts; alarm messages are written to a log and reported to the central data processing system; DUT protection selects a protection level automatically from the alarm parameter type and the extent of the deviation, ranging from flagging an out-of-tolerance condition, through shutting off the signal input, to power-down protection.
Very long environmental test runs generate enormous quantities of test data. Optimised database access, sound table design and curve pre-reporting give the solution powerful data processing, with Word and Excel report formats. Given the communication protocol, users can customise upload to the central data processing system.
The access control function lets users open different levels of operating permission.
Scalable resources, instrument interchange
Three-level task mechanism: sequence / plan / step
Resumable testing & multi-level alarm design
Graphical environment-profile editor
Word / Excel reports & central-system upload
Send us the device under test, frequency range, sample size and site conditions. Our engineering team will provide an executable configuration during solution consulting and site planning.